Looking for support on a project with our firm?: Click Here

Home / Services / Hurricane Screen and Shutter Engineering
Site-specific shutter support

Hurricane Screen and Shutter Engineering in Florida

Site-specific engineering for hurricane screen and shutter spans, supporting conditions and connections.

Open Shutter Request Form (PDF) →
Illustration of shutter panels, a span dimension and a magnified attachment connection.
Shutter span and attachment · Concept illustration, not an engineered detail.
Service overview

Start with the product. Review the installation.

Florida Engineering’s shutter request form identifies exceeded product-approval spans and special connections as reasons for site-specific review. Share the selected system, approval documents and actual supporting conditions to define the work.

01

Span review

Identify the opening dimensions and the proposed span that needs engineering review.

02

Connection details

Document proposed attachments and any detail that differs from the product approval.

03

Supporting structure

Provide the wall, concrete, wood or metal support information needed to assess the installation.

Site-specific engineering is not blanket product approval or an automatic extension of a product’s tested limits. The proposed installation and available product documentation determine what can be supported.
Before you start

What to send our team

  • Project address, permitting agency and contact information
  • Shutter or screen Florida approval number and/or Miami-Dade NOA
  • Dimensions and sketches showing plan views, side views and heights
  • Host material, connection details and the specific departure needing review
Need help gathering the details? Contact us →
How it works

From request to review

  1. 1

    Identify the review condition

    Explain the span, connection or other site-specific issue.

  2. 2

    Provide the product and host details

    Send approvals, sketches and information about the supporting structure.

  3. 3

    Confirm a supported solution

    The team evaluates the request and confirms the available engineering path.

Common questions

A few details before you begin.

Can engineering automatically approve a longer span?

No. A request to exceed a listed span needs review of the product documentation and proposed conditions. A supported solution cannot be promised before that review.

What if my attachment differs from the approval?

Show the exact proposed connection and supporting material. The FE form specifically identifies special connections as a reason for site-specific review.

Do I need the product approval number?

Yes. The request form includes fields for the Florida approval number and Miami-Dade NOA. Send the corresponding documents and installation details when available.

Have a shutter detail that needs review?

Share the project location and available documents so we can confirm the scope and next steps.

Open Shutter Request Form (PDF) →

Our FE / LE / GE team

Engineering in 23 licensed states

Together, Florida Engineering, Lightning Engineering and Gunderson Engineering provide engineering services across 23 licensed states. Services are provided by the firm authorized in your project’s state. Inspections are available in Florida only.

Select your project state to visit the company that serves that location.