New system design
Engineering for a proposed onsite wastewater system, based on the project use, site information and requirements identified during scope review.
Looking for support on a project with our firm?: Click Here
Engineering and design for a proposed septic system, system modification or repair, with the scope based on your property and project records.
Project-specific engineering plans, calculations and design coordination.

Florida Engineering provides septic engineering and design. Send the property address, parcel information and a description of the proposed work so our team can review the available records and identify what is needed for a proposal.
Engineering for a proposed onsite wastewater system, based on the project use, site information and requirements identified during scope review.
Design support for repairs or modifications. Existing permits, system records and a clear description of the proposed change help establish the engineering scope.
Engineering drawings and supporting information for the agreed scope, coordinated with the records and requirements supplied for the project.
Include the full property address and describe the work you are planning. Share the available records together, and identify anything still being prepared by another project team member.
Chattahoochee government contact
Use the property address to ask which office handles the proposed work. The government contact identifies the jurisdiction; it does not establish a project-specific application requirement.
The Florida Building Commission’s online system provides building-code resources and a search for local amendments and interpretations. Confirm the applicable requirements and submission route with the authority responsible for the property.
Send that authority’s written comments with the project plans and property information. Identify the proposed work and the documents being requested so the engineering scope can address the actual application.
Send the property survey, proposed use, existing system records and available site evaluation. Identify whether the request concerns a new system, a modification or a repair before the design scope is confirmed.
A complete inquiry helps the engineering team understand the property before promising a deliverable. Provide available records even if they are incomplete, and identify information that is still being obtained.
Use the available plans and actual agency comments to define the work.
Yes. Share the information you have and identify what is missing. We will review the request and explain what additional records are needed before confirming the scope.
The DEP application guidance explains that state permitting does not replace applicable local approvals. Confirm the current requirements with the responsible authority for your property.
Together, Florida Engineering, Lightning Engineering and Gunderson Engineering provide professional engineering across 23 licensed states. Choose your project state to reach the responsible company.
Share the location, proposed work and available records so we can review your engineering request.
Optional cookies help us understand visits and improve our advertising. You can reject them and still use this website. Privacy policy
Core site functions and remembering your privacy choice.
Contact and project-support forms remain available. Live chat loads when you click Chat with our team, independently of these optional cookie settings.